India's leading partner for precast Solar ICR and Main Control Rooms.

    To revolutionize the renewable energy landscape by replacing slow traditional construction with advanced, speed-driven precast solar inverter control room technology.

    To empower solar developers with fail-safe, aesthetically superior, and rapidly deployable Solar ICR and MCR solutions that ensure grid stability and uninterrupted power generation.

    Fortico Infra Private Limited was founded in 2025 around a single observation: solar plants were being commissioned in months, while the buildings that house their inverters and control equipment were still being built brick by brick over weeks of monsoon delays, labour shortages and rework. We set out to take that entire scope off the critical path. From our base in Bikaner, Rajasthan — inside the Thar Desert solar belt, one of the highest-irradiance regions in the country — we manufacture control-room buildings the way a factory makes products, not the way a site makes buildings.

    We were the first company in the Indian solar industry to industrialise Inverter Control Rooms (ICR) and Main Control Rooms (MCR) through precast technology. Wall panels, beams and roof slabs are cast under cover on a 5-acre yard while the site is still being graded, cured to strength under controlled conditions, then transported and erected in days on our own cranes and trailers. The result is 282+ MW of solar capacity protected by Fortico structures, 84+ ICRs deployed and 28+ projects closed out — with the same dimensional tolerance on the last unit as on the first.

    Everything we own supports that promise: the casting yard, the batching and curing discipline, the QA lab, the cranes, the trailers and the engineers who travel with them. Nothing critical is subcontracted, because a timeline is only as reliable as its weakest outsourced link.

    Fortico Infra site team executing precast works at a utility-scale solar plant in Rajasthan
    282+

    MW Solar Assets Protected by our Structures

    84+

    Solar Inverter Control Rooms Deployed

    28+

    Projects Completed

    01

    Skilled labor shortage in solar project regions

    Remote locations like the Thar Desert face 40-60% labor shortages for specialized civil works, making factory-produced precast the only reliable solution.

    02

    Need for standardized, fast-deployable civil infrastructure

    India's 300+ GW solar target requires infrastructure that can be deployed at scale — cast-in-situ methods simply cannot keep pace with project timelines.

    03

    Gap between factory quality and site execution

    Weather, skill variability, and supervision gaps cause 70% of civil defects in solar projects. Our factory-controlled production eliminates these variables entirely.

    India's leading partner for precast Solar ICR and Main Control Rooms.

    Execution Focus

    Practical, site-condition-driven approach. Every decision is validated against field realities of remote solar installations.

    Constructability

    Designs that prioritize ease of installation — reducing crane time, alignment effort, and skilled labor dependency.

    Standardization

    Repeatable, scalable production modules. Our standardized approach enables 2 complete ICR sets per day.

    Quality First

    No shortcuts — every element undergoes 8-stage inspection, is tested per IS standards, and is traceable for 7 years.

    Fortico Infra Pvt Ltd logo

    100% company-owned transport & heavy machinery

    Fortico owns and operates every vehicle and machine in our supply chain — from concrete mixers and mobile cranes to flatbed trucks, tractors, and engineer transport vehicles. Zero reliance on third-party logistics means guaranteed timelines, controlled costs, and uncompromised quality.

    Heavy-Duty Mobile Cranes — heavy equipment in the Fortico Infra construction fleet

    Heavy-Duty Mobile Cranes

    Company-owned mobile cranes for precision lifting and installation of precast panels weighing up to 12 tonnes at remote solar sites.

    Concrete Transit Mixers — heavy equipment in the Fortico Infra construction fleet

    Concrete Transit Mixers

    In-house transit mixers ensuring consistent, high-grade M30/M40 concrete supply directly to our precast casting yard — zero dependency on external RMC plants.

    Heavy Transport Trucks — heavy equipment in the Fortico Infra construction fleet

    Heavy Transport Trucks

    Company-owned flatbed trucks and multi-axle trailers for safe, on-time delivery of precast wall panels, beams, and roof slabs to project sites across Rajasthan.

    Excavators & Hydra Cranes — heavy equipment in the Fortico Infra construction fleet

    Excavators & Hydra Cranes

    Full complement of earthmoving equipment — JCB excavators, boom loaders, and hydra cranes for foundation work, site preparation, and element installation.

    Well-Equipped Safe Transportation — heavy equipment in the Fortico Infra construction fleet

    Well-Equipped Safe Transportation

    Dedicated fleet of well-equipped vehicles for our engineers and executives — ensuring round-the-clock safe site access across desert terrain.

    Tractors & Material Haulers — heavy equipment in the Fortico Infra construction fleet

    Tractors & Material Haulers

    Tractor-trailer units for heavy material movement — transporting precast beams, aggregate, sand, and reinforcement steel from factory to site across rural routes.

    6+

    Mobile Cranes

    4+

    Transit Mixers

    12+

    Heavy-Duty Trucks

    8+

    Excavators & Loaders

    10+

    Safe Transport

    6+

    Tractors & Haulers

    Fortico Infra precast manufacturing facility casting yard in Bikaner, Rajasthan

    5-acre manufacturing facility

    Year
    2025
    Area
    5 Acres
    Location
    Bikaner, Rajasthan
    Daily Capacity
    2 ICR Sets
    Steel Grade
    JSW Fe 550D
    Cement
    UltraTech / Birla

    Jaipur–Jodhpur Bypass, Ridmalsar–Napasar Circle, Bikaner – 334001

    Independently audited management systems

    Fortico Infra Private Limited holds four international management system certifications, issued by LMS Assessments Limited (EGAC accredited, IAF MLA member) and covering infrastructure development, civil construction and project management services at both our Bikaner office and our Ridmalsar manufacturing facility. A certificate is not a plaque for us — it is an external auditor confirming that the way we plan, cast, inspect, transport and document work is written down, followed and traceable. All four were issued on 04 June 2026, carry annual surveillance audits and run to recertification in June 2029.

    What each standard means for your project

    Scope: Infrastructure development, civil construction & project management services

    Certificates issued by LMS Assessments Limited. Click any certificate to view the original PDF.

    From certificate to practice on every project

    Standards only matter if they change what happens on the ground. Below is how the four management systems actually run inside Fortico — the same sequence every ICR, MCR and foundation package goes through, from the first drawing to the handover file.

    01

    Design freeze & method statements

    Every project starts with a reviewed GA drawing, precast element schedule and a written method statement for casting, lifting and erection. Nothing is cast against a verbal instruction — the ISO 9001 document-control route means the yard only works from the current approved revision.

    02

    Controlled material approval

    JSW Panther Fe 550D reinforcement and UltraTech / Aditya Birla cement arrive with mill and batch test certificates, are checked against IS 1786 and IS 456 requirements, and are logged before use. Rejected material is quarantined, not reworked into a pour.

    03

    8-stage inspection & test plan

    Shuttering, reinforcement, cover, embeds, pour, cube testing, curing and demoulded finish are each signed off at hold points. Cube results at 7 and 28 days are retained with the element ID, so any panel on any site can be traced back to its pour.

    04

    Safe lifting, transport & erection

    Under ISO 45001, each lift runs to a plan: certified slings and shackles, inspected crane logs, trained riggers, marked exclusion zones and a daily toolbox talk. Loads travel dunnage-protected on route-surveyed trailers to prevent transit cracking.

    05

    Environmental controls at the yard & site

    ISO 14001 practice means curing water is recovered and reused, stockpiles and haul routes are dust-suppressed, steel offcuts and broken concrete are segregated for recycling, and fuel and oil are stored on bunded ground away from natural drainage.

    06

    Records, handover & audit trail

    Each project closes with a handover file: approved drawings, material certificates, ITP sign-offs, cube results, lift records and as-built notes. Records are held for seven years under ISO/IEC 27001 access and retention rules and are available for client or lender audit.

    Internal audits are run against these procedures through the year, with corrective actions closed before the annual surveillance audit by LMS Assessments Limited.