End-to-end precast solutions for solar power plants.

    From design consultation to factory production, transport, and site installation — we handle the complete civil infrastructure lifecycle for utility-scale solar projects.

    Precast vs. traditional cast-in-situ

    Parameter
    Cast-in-Situ
    Fortico Precast
    Installation Time
    14–21 days per ICR
    3–5 days per ICR
    Manpower Required
    25–30 workers
    8–10 workers
    Quality Control
    Weather & skill dependent
    Factory-controlled, 8-stage QA
    Surface Finish
    Variable, needs plastering
    Fair-faced, ready to paint
    Dimensional Accuracy
    ±15–20 mm typical
    ±5 mm guaranteed
    Rework Rate
    10–15% average
    <1% across projects
    Thermal Performance
    Basic — no insulation
    Specialised concrete mixes, lower indoor temp

    Precast Solar Inverter Control Rooms (ICR)

    Ready-to-install precast ICR systems manufactured parallel to site grading. Our modular approach allows installation in days — not weeks — with ISO-grade quality guaranteed.

    Products
    Inverter Control Room foundations
    ICR RCC superstructures
    BOT foundations
    NIFPS foundations
    ICOG foundations
    Custom RCC structures
    Materials
    JSW Panther Fe 550D
    UltraTech / Birla Cement
    Capacity
    2 complete ICR sets/day
    IS 456 compliant
    Precast Solar Inverter Control Room (ICR) building manufactured by Fortico Infra
    5,000 sq ft precast Main Control Room (MCR) building for a utility-scale solar plant

    Main Control Room (MCR) Buildings

    Complete 5,000+ sq ft MCR buildings with superior finish quality. Our MCR structures feature full RCC construction with roof slab casting, steel shuttering, plastering, waterproofing, and electrical conduit integration — built to the highest standards for utility-scale solar plants.

    Complete MCR civil works
    RCC foundations & superstructures
    Switchyard equipment foundations
    Precision alignment ±5mm
    Post-installation verification
    OJT/TBT safety briefings
    Tolerances
    ±3 mm
    Level
    ±5 mm
    Alignment
    ≤3 mm/m
    Verticality

    Switchyard & Equipment Foundations

    Precast foundations for switchyard gantries, equipment pads, and cable trenches — engineered for precision alignment and rapid deployment.

    Gantry column foundations
    Equipment pad foundations
    Cable trench construction
    Fire wall & boundary works
    Drainage systems
    Chain-link fencing
    View Quality Framework
    Reinforced switchyard equipment foundations cast at a solar substation site
    Solar EPC infrastructure works including roads, drains and civil balance of plant

    Integrated EPC Infrastructure

    Complete end-to-end infrastructure for solar plants — from road work and drainage to internal civil infrastructure, all executed with our precast-first methodology.

    Road work (bitumen + CC)
    Internal drainage systems
    Gravel laying & compaction
    Backfilling operations
    Site grading & levelling
    Complete documentation & as-builts

    Precast Design & Structural Engineering

    Custom precast element design tailored to each project's specifications. Our engineering team works with EPC partners from the design stage through to installation verification.

    IS 456:2000
    Plain & Reinforced Concrete
    IS 1786:2008
    High Strength Steel Bars
    IS 516:1959
    Concrete Strength Testing
    IS 269:2015
    Cement Specifications
    Precast engineering and mould detailing at the Fortico Infra casting yard

    We engage early in the project lifecycle

    Our early-stage engagement model ensures precast infrastructure is integrated into project planning from day one.

    01

    Capacity Planning

    Production scheduling aligned with EPC's block-wise construction sequence

    02

    Infrastructure Sequencing

    Delivery phasing matched to site readiness and crane availability

    03

    Delivery Strategy

    Just-in-time logistics reducing site storage needs and handling risks

    Need precast for your next solar project?

    2 ICR sets/day capacity. IS 456 compliant. Ready to deploy.

    Request a Quote